Maintenance Design Group provided a review of the program, conceptual design, and design for expansion of the Colorado Springs Utilities Department facilities. The review involved operations and expansion at two sites, Lyon Young and Pinkerton Service Centers. The facilities included workshops, vehicle maintenance, warehouse, and yard storage. The facilities provide services for 1,900 vehicles and equipment and include two fuel islands and the relocation of a CNG fueling center.

The project continued into Contract Documents phase for expansion of the facilities at the two existing work centers. These facilities included new gas, water, and electric meter shops, heated vehicle storage, a new warehouse, and office and site remodel to handle the consolidation of field services.

Project Highlights

  • New construction, renovation and additions used to meet facility needs.
  • Extensive master planning of all facilities to provide optimum re-use instead of all new construction.
Services Provided
Preliminary Design
Space Needs Program
Master Plan/Concept Design
Fleet Size

1,900 Vehicles/Equipment

Facility Size

212,000 square feet

Construction Cost

$12,000,000